Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Apr 04, 2009     Brake lines - (2.1 hours)       Category: Controls
The brake lines are finished except for the 90-degree bends at the bottom that will connect to the landing gear legs. (These bends will be made after the gear is attached for good.)

I spent a lot of time getting these lines just right, especially the double bends near the center fittings, since they'll be partially visible from the cockpit.

I ended up supporting the lines with an Adel clamp on each side. Because there's no stiffener angle at the bottom of the bulkhead on the left side, and therefore no convenient place to fasten an Adel clamp, I made a standoff from a short piece of 1/8" aluminum tubing and a couple of washers.

For anti-chafe on the brake lines where they enter the gear towers, I installed a grommet hole protector on the edges of each of the holes. Eventually, I might also put some heavy-duty shrink-tube on the lines in those locations.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.